I am a Senior Lecturer in the School of Construction Economics and Management at University of the Witwatersrand, South Africa. In the past, I have been a Lecturer in the School of Construction Management and Engineering at the University of Reading, UK (2010-12); and also a Post-Doctoral Academic Fellow (2009) and Graduate Teaching Assistant (2008). I completed my PhD at University of Reading in Dec 2008 on the relationship between risk and price in tendering. Prior to transferring to Reading in Jan 2008, I was an MPhil/PhD student at KNUST, Ghana (2004-07). I gained my undergraduate degree in Building Technology from Kwame Nkrumah University of Science and Technology (KNUST), Ghana in 1998-2002. During school days, my peers elected me to serve in several leadership positions including SRC President at KNUST. From 1994-96, I attended Suhum Sec. Tech. School after basic education at schools in Ghana and Nigeria. I did my National Service with the Fanteakwa District Assembly in 2002-03. After that, I worked at the Development Office of KNUST until I started my PhD in 2004. I am a co-organiser for the WABER Conference and an author of 30+ research publications.

Thursday 7 October 2010

Risk accountability in the tender process of contractors in Ghana and UK

RISK ACCOUNTABILITY IN THE TENDER PROCESS OF CONTRACTORS IN GHANA AND THE UK

Samuel Laryea
School of Construction Management and Engineering, University of Reading, P.O. Box 219, Reading, RG6 6AW, UK

Forthcoming in International Journal of Project Organisation and Management

ABSTRACT
This paper investigates the process how the contractors take account of risk when calculating their bids for construction work based on preliminary investigation and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which they operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Keywords: contractors, Ghana, risk accountability, tendering, UK.